News Center
News Center
Your location:
Homepage
/
/
Transformation of the original silk frame for production management

Transformation of the original silk frame for production management

  • Categories:news
  • Author:
  • Origin:
  • Time of issue:2019-05-20
  • Views:

(Summary description)Because it is a modified equipment, the space for production operations has been compressed. Especially the space of the original silk rack, the production staff is somewhat inconvenient when operating. Each machine table needs to hang spare raw silk (ie POY), and the net weight of the silk cake is 8 kg, 12 kg, and even 15 kg or more of polyester raw silk according to different batch numbers. The silk hanger operates on the machine, and each machine surface must be at least 120 silk cakes hung. Over time, the wire fence of the original wire frame began to loosen, and the black fixed plastic block began to be damaged. As a result, the original wire was often dropped by the wire fence, rubbed, or even crushed, which reduced the AA rate of the product to a certain extent. , Increase the amount of waste wire, and the skewed barbed wire stacking also affects the management of the workshop site.

Transformation of the original silk frame for production management

(Summary description)Because it is a modified equipment, the space for production operations has been compressed. Especially the space of the original silk rack, the production staff is somewhat inconvenient when operating. Each machine table needs to hang spare raw silk (ie POY), and the net weight of the silk cake is 8 kg, 12 kg, and even 15 kg or more of polyester raw silk according to different batch numbers. The silk hanger operates on the machine, and each machine surface must be at least 120 silk cakes hung. Over time, the wire fence of the original wire frame began to loosen, and the black fixed plastic block began to be damaged. As a result, the original wire was often dropped by the wire fence, rubbed, or even crushed, which reduced the AA rate of the product to a certain extent. , Increase the amount of waste wire, and the skewed barbed wire stacking also affects the management of the workshop site.

  • Categories:news
  • Author:
  • Origin:
  • Time of issue:2019-05-20 16:23
  • Views:
Information

  Because it is a modified equipment, the space for production operations has been compressed. Especially the space of the original silk rack, the production staff is somewhat inconvenient when operating. Each machine table needs to hang spare raw silk (ie POY), and the net weight of the silk cake is 8 kg, 12 kg, and even 15 kg or more of polyester raw silk according to different batch numbers. The silk hanger operates on the machine, and each machine surface must be at least 120 silk cakes hung. Over time, the wire fence of the original wire frame began to loosen, and the black fixed plastic block began to be damaged. As a result, the original wire was often dropped by the wire fence, rubbed, or even crushed, which reduced the AA rate of the product to a certain extent. , Increase the amount of waste wire, and the skewed barbed wire stacking also affects the management of the workshop site.

  Under the initiative and strong support of the workshop leaders, the maintenance team cooperated with the production workshop team to carry out a series of transformations on the original silk frame of the RPR machine. First, the maintenance team removed all the original black fixed plastic blocks. After re-measurement and positioning, drill holes on the fixed rod of the original wire frame, and then install the fixing screws to reinforce the wire fence on the original wire frame to prevent the fence from slipping off. At the same time, the two teams in the production workshop organize staff every day to collect the cardboard in the spandex box, use the waste, cut the cardboard, and cover it on the wire mesh to make an artificial partition without mesh, which can prevent abnormalities in the upper layer. The broken ends of the waste thread fell off, breaking the thread that was being produced in the lower layer.

  After the renovation, I often hear employees say: The problem of the original wire frame here is solved at once, and there is no need to worry about the original wire frame breaking the original wire in the future. We no longer have to run around to make up for those abnormally broken spindles. We can spend more time and energy on inspecting silk roads and inspecting product quality.

  There is no mountain higher than people, no road longer than feet. In our daily life and work, there are difficulties, and it is impossible to solve them overnight. To do things is to persevere, and to discover and explore. Although the equipment in the post-spinning workshop has been outdated for a long time, we believe that with the concerted efforts of all our loved ones, we will continue to discover and explore, continue to improve and maintain, step by step, and believe that we will do better and better!

Scan the QR code to read on your phone

Relevant information

Niu will turn the world, let us move forward firmly in 2021!
2021 01-20

Niu will turn the world, let us move forward firmly in 2021!

This year we span winter and spring witnessed many miracles This year Those who made us I feel the pessimistic hurdle is over Past ones The night we thought we couldn’t survive It’s finally dawn Let us move forward firmly in 2021!
 Double Ninth Festival, May the light never grow old, you and I are good
2020 10-25

Double Ninth Festival, May the light never grow old, you and I are good

  One‎one‎turn around, the summer is dead‎ Looking back once, autumn has become a wind‎scape. There is a kind of deep love that makes you in my heart; There is a kind of worry, called Tianliang Tianyi. Today’s Double Ninth Festival May autumn‎wind‎not dry, peaceful years‎good, Time‎I am not old, you and I are good!
 Tribute to the anti-flood hero: the retrograde who braved the wind and waves!
2020 08-11

Tribute to the anti-flood hero: the retrograde who braved the wind and waves!

The flood is ruthless, and there is love in the world. You are here, we are at ease  Like the 1998 Anti-Flood War, This is a battle where victory belongs to us. 2020 is an extraordinary year, There will eventually be the day when the clouds and fog are lifted and the sunrise is seen.

Contact Number:0794-8233988 ; 0794-8253988

Address:No. 298, Zhushan Road, High-tech Development Zone, Fuzhou City, Jiangxi Province
E-Mail:
jxhyjd88@163.com

Copyright © Jiangxi Huayuan Electromechanical Co., Ltd.       Jiangxi ICP No. 17006370-1     This website supports ipv4/ipv6 two-way access      Technical Support:300.cn - nanchang